Tel: 01793 822738 Fax: 01793 831879 Email: enquiries@smithsroofing.co.uk

News..

May 2014

Further contract awarded to Smiths to undertake the re-roofing of the Corvus Building, Swindon College ( North Star Campus ), Swindon - 2,972 m2 of insulated Sarnafil roofing ( Mangement / Sarnafil Plus system )

Beards Construction award contract for new Kingspan composite panel roof sheeting and Sarnafil single ply on the new sports hall at Prior Park College, Bath.

April 2014

Smiths awarded contract for new Ash and Lacy standing seam metal roofing system / and Mastic Asphalt roofing at King Edward School, Bath.

Contract awarded to undertake the re-roofing of the Lyra Building, Swindon College ( North Star Campus ), Swindon - 1,019 m2 of new insulated Sarnafil roofing.

Beard Construction appoint Smiths to undertake re-roofing at Bradfield…

March 2014

Works commence at Bushy Park, Teddington for Beard Construction - Built-up felt roofing / Decra metal roof tile system.

Further works carried out and completed for South Marston DC Ltd.

Roof tiling works carried out and completed at Kingsdown School and Catherine Wayte School, Swindon.

Works completed at Lady of Lourdes, Hungerford for Beard Construction…

Feb 2014

Debut / Babcock provide instructing to undertake the re-roofing of various buildings located within the Duke of Glos Barracks - works involve new GRP roof sheeting / new insulated built-up felt roofing / new insulated Sarnafil single ply / new proprietary gutter systems.

Smiths commence works to 3no blocks of flats at St Oswalds, Bristol for Easton Bevins - 980 m2 of insulated…

Jan 2014

Integral ( Build ) Ltd instruct Smiths Roofing Contrs Ltd to undetake the re-roofing of Hangers 64 & 65, Duke of Glos Barracks - 9,272 m2 of new Sarnafil single ply / 1,280 m2 of vertical slating - total contract value of £1,180,363.00.

Primus Build place order to undertake new Sarnafil single ply on a project in Belgravia, London.

Works carried out and completed…

Dec 2013

Limpley Stoke Eco House project completed for ER Hemmings ( Building ) Ltd - New insulated Sarnafil single ply, overlaid with new living sedum green roofing system, finished with new Zinc sheet detail to / around perimter.

Surf Telecoms instruct to replace an existing waterproofing to sub-station in Bath.

Remedial repairs carried out and completed for South…

Our Proud History

Our Proud History

Established in 1967 we have decades of industry experience...

Read more...
New Build / Refurbishment

New Build / Refurbishment

We can help repair or renew your roof...

Read more...
Project Gallery

Project Gallery

View a selection of our completed projects...

Read more...

Latest News

Tags

Archive